EPM

What is Electronic Performance Monitoring (EPM)?

EPM uses sensors, wearables and data platforms to measure how work is carried out on site: where, how much, at what pace and in what conditions.

In construction, productivity has been measured for decades with stopwatches, spreadsheets and work sampling. These methods are valuable but slow, occasional and hard to scale. EPM makes continuous, objective measurement possible and gets the information to site managers in time to act on it.

What it measures

Productivity

Productive time, waiting, travel and actual progress per crew or activity.

Health

Posture, physical effort, fatigue and exposure to ergonomic risk.

Safety

Proximity to plant, entry to restricted zones and unsafe behaviour.

Quality and sustainability

The link between productivity, resource use and environmental impact.

Which technologies

Real-time location systems (RTLS, UWB, Bluetooth, GNSS), accelerometers and inertial sensors, physiological wearables, computer vision, IoT and 5G networks, and machine-learning models that turn signals into activities and indicators.

People first: Human-Data Interaction

Measuring people raises ethical questions: privacy, consent, how the data is used and whether it is trusted. My research puts forward Human-Data Interaction (HDI) as a condition for responsible EPM: workers understand what is measured (legibility), have a say over their data (agency) and can negotiate how it is used (negotiability). Without that, the technology is not adopted, or is adopted badly.

Why now, in Chile?

Chilean construction faces productivity gaps, a shortage of skilled labour and demanding health and safety requirements. At the same time, the country is rolling out 5G and strengthening personal data protection. It is the right moment to design EPM that serves companies and workers alike, and to test it on real sites, as the Worker 5.0 project does.

Trabajador 5.0 →

Open course: Electronic Performance Monitoring (EPM) for Construction Management (Zenodo)

Publications on EPM and HDI